All Building Components are 100% Recyclable.

Optional Permanent Utility Group—Emergency Shelter Program

Width 9’-10” (3.01m)
Length 11’-6” (3.51m)
Ceiling Height 9’-0” vaulted open air (2.47m)
Floorspace Kitchen/Fireplace | 53 sq. ft. (4.92 sq. m)
Shower/Toilet | 33 sq. ft. (3.07 sq. m)

Exterior Finish

Proprietary Structural Stucco

Color

Numerous colored finish coatings are available

Construction Duration

Permanent structure can be easily completed in under seven (7) days

Panelized Framing

The proprietary light gauge galvanized steel panelized framing system comes “ready-toassemble”. No cutting is required. Panels can be buried 6 inches (15.2cm) into top soil with an additional 6 inch (15.2cm) raised soil fill floor for high wind stabilization. This will maintain an 8 foot (2.44m) ceiling along outside edges. Framing components could carry (at least) a 5 year warranty.

Photos

Optional Equipment

Solar Power Package

The optional solar power package provides the following:

  • 1 Solar panel, 5 watt, with secure mounting structure
  • 2 LED lamps (DC-powered)
  • 1 voltage regulator
  • 1 rechargeable battery, sealed lead acid, 12 volt 7.2 amp-hour
  • 2 switches
  • 1 fuseholder with fuse, 5 amp
  • 1 cell phone connector (optional)

Rainwater Collection

The optional rainwater collection package provides the following:

  • Safe low toxin metal roof, gutter and downspout
  • Rain Barrel with elevated base
  • Filtration System
  • Spigot and/or hand pump

Additional Options

The Utility Group can be provided with the following:

  • Plumbing Fixture Upgrades (Toilet, Shower Head, Faucets)
  • Drop-in Sink
  • Propane Tank for cooking
  • Translucent Shower Door